BRIDGE

CABLE STAYED BRIDGE ATHWALINES ADAJAN, SURAT

 

Cable Stayed Bridge.

 

Name of Work : Construction of Cable Stayed Bridge at balance portion of existing bridge on Tapi river joining Athwalines Adajan in Surat.

 

Client : Surat Muncipal Corporation.

 

Length of Bridge : 918 m

 

SARDAR BRIDGE ATHWALINES ADAJAN, SURAT

 

River Bridge

 

Name of Work : Construction for widening on both sides of Sardar Patel river bridge joining Athwa - Adajan on river Tapi at Surat on EPC basis (design, engineering, procurement and construction).

 

Client : Surat Muncipal Corporation.

 

Length of Bridge : 760 m U/S & 772m D/S

 

BRIDGE ON RIVER TAPI NR. KATHOR VILL. NH-8, SURAT

 

River Bridge

 

Name of Work : Additional three lane bridge with its approaches & improvement of the existing bridge proper & its approaches river Tapi in km 246/4-8 on NH-8 Nr. Kathor Village, Surat.

 

Client : Project Director NHAI, PIU-Vadodara & Mordern Road Makers Pvt. Ltd. Subsidiary of I.R.B.Mumbai.

 

Length of Bridge : 440 m

 

FOUR lANING BALANCE CANTILEVER BRIDGES, PUNJAB

 

Perennial Water Canal Bridge

 

Name of Work : Four laning of Pathankot - Amritsar section of NH-15 from km 6+082 to km 108+502 in the state of Punjab under NHDP phase III B on DBFOT basis. Major Bridge across Hydel Channel at Ch. 11+920 Km. & UBDC Channel at Ch. 51+980 Km.

 

Client : National Highway Authority of India, & Mordern Road Makers Pvt. Ltd. Subsidery of I.R.B.Mumbai.

 

Length of Bridge : 137 m each bridge

 

KAALI RIVER BRIDGE, KARNATAK

 

River Bridge

 

Name of Work : Four Lanning of Goa/ Karnataka Border to Kundapur Section NH-17 from km. 93.700 to Km 283.300 in the state of Karnataka under NHDP phase IV on DBFOT basis. "Construction of Kaali River Major Bridge (CH. 102+470)".

 

Client : National Highway Authority of India, & Mordern Road Makers Pvt. Ltd. Subsidery of I.R.B.Mumbai.

 

Length of Bridge : 665.8 m

 

MANDAVI TAPI RIVER BRIDGE, GUJARAT

 

River Bridge

 

Name of Work : Construction of Major Bridge over river Tapi and bypass of Mandavi and Tarsada Town on N.H.56 in replacement of existing route at K.m.567/00 to 572/200 of NH-56 in the State of Gujarat.

 

Client : The Chief Engineer, MORT&H

 

Length of Bridge : 480 m Major Bridge + 340 m Approaches + 2140 m Connectivity Road.

 

PARLE POINT FLY-OVER BRIDGE, SURAT

 

Fly-over Bridge

 

Name of Work : Construction of Fly-over Bridge at Parle Point Junction on Surat - Dumas Road, Surat.

 

Client : Executive Engineer (Bridge), Surat Municipal Corporation.

 

Length of Bridge : 2186.79 m (Two lane)

 

KAMREJ FLY-OVER BRIDGE

 

Fly-over Bridge

 

Name of Work : Construction of Flyover @ km. 249/581 & 260/705 including Pedestrian underpass & Kadodra khadi river bridge (260/397) & Panjar Khadi river bridge (244/780) (Project chainages) in Six/Four-laning of Km. 198/000 to km. 263/000, Bharuch to Surat section of NH- 8 in Gujarat state (Package-2).

 

Client : Chief General Manager, NHAI & Modern Road Developers Subsidiary IRB, Mumbai.

 

Length of Bridge : 168 m

 

KADODRA FLY-OVER BRIDGE

 

Fly-over Bridge

 

Name of Work : Construction of Flyover @ km. 249/581 & 260/705 including Pedestrian underpass & Kadodra khadi river bridge (260/397) & Panjar Khadi river bridge (244/780) (Project chainages) in Six/Four-laning of Km. 198/000 to km. 263/000, Bharuch to Surat section of NH- 8 in Gujarat state (Package-2).

 

Client : Chief General Manager, NHAI & Modern Road Developers Subsidiary of IRB, Mumbai.

 

Length of Bridge : 168 m

 

KADODRA KHADI CREEK BRIDGE

 

Creek Bridge

 

Name of Work : Construction of Flyover @ km. 249/581 & 260/705 including Pedestrian underpass & Kadodra khadi river bridge (260/397) & Panjar Khadi river bridge (244/780) (Project chainages) in Six/Four-laning of Km. 198/000 to km. 263/000, Bharuch to Surat section of NH- 8 in Gujarat state (Package-2).

 

Client : Chief General Manager, NHAI & Modern Road Developers Subsidiary of IRB, Mumbai.

 

Length of Bridge : 56.25 m

 

PANJAR KHADI CREEK BRIDGE

 

Creek Bridge

 

Name of Work : Construction of Flyover @ km. 249/581 & 260/705 including Pedestrian underpass & Kadodra khadi river bridge (260/397) & Panjar Khadi river bridge (244/780) (Project chainages) in Six/Four-laning of Km. 198/000 to km. 263/000, Bharuch to Surat section of NH- 8 in Gujarat state (Package-2).

 

Client : Chief General Manager, NHAI & Modern Road Developers Subsidiary of IRB, Mumbai.

 

Length of Bridge : 56.35 m

 

MAGDALLA FLY-OVER BRIDGE, SURAT

 

Fly-over Bridge

 

Name of Work : A/6 LANING OF GUJARAT/ MAHARASHTRA BORDER SURATHAZIRA PORT SECTION OF NH6 IN THE STATE OF GUJARAT UNDER NHDP PHASE III ON DBFO BASIS FROM KM 0+000 TO 132+913.

 

Client : National Highways Authority of India & Isolux Corsan Inda.

 

Length of Bridge : 100 m